How long does a website redesign take?
Most website redesigns take 4 to 8 weeks, larger ones 8 to 16. See the week-by-week plan, what causes delays and what happens after launch day.

In this article
Key takeaways
- ✓Most business website redesigns take 4 to 8 weeks; ecommerce, catalogue and platform moves take 8 to 16.
- ✓Content and approvals, not design or code, cause most delays.
- ✓Launch is not the finish line: search engines take a few weeks to process the changes.
- ✓Count backwards from your launch date and add a buffer for approvals.
A website redesign takes 4 to 8 weeks for most business websites, and 8 to 16 weeks for ecommerce stores, large catalogues or redesigns that also move to a new platform. Where you land depends on two things: how much changes (a visual refresh, a new structure, or a new platform) and how ready your content is. And launch day is not the finish line. Search engines need a few weeks to process the changes, so plan your launch date with that in mind.
Website redesign timeline at a glance
| Site type | Typical redesign time |
|---|---|
| Visual refresh, same platform | 2 to 4 weeks |
| Business website, 10 to 50 pages | 4 to 8 weeks |
| Ecommerce store, catalogue or web app | 8 to 16 weeks |
| Redesign with a platform move | 8 to 16 weeks |
| Multilingual or multi-division corporate site | 3 to 6 months |
These are the ranges we plan around on our own projects, and every project gets its own dated plan before work starts.
The website redesign process, week by week
Here is how a typical 6-week business website redesign runs. The key is overlap: content is written in parallel from week 1, and each approval unlocks the next stage.

- Week 1, discovery and audit. We audit the current site before changing anything: which pages bring traffic and enquiries, how fast the site is, what Google has indexed. The output is a goal, a page list and a fixed scope.
- Weeks 2 to 3, structure and design. A sitemap, wireframes for the key templates, then full designs. You approve each step before the next starts.
- Weeks 3 to 5, build. Templates and pages, CMS setup, integrations such as CRM and analytics, and content entry. Technical SEO, schema markup and speed tuning happen here, not after launch.
- Weeks 5 to 6, testing and migration. Testing on real phones and browsers, form checks, accessibility checks, and the redirect map that sends every old URL to its new home.
What happens after launch day
The search side of a redesign runs on Google's clock. Google's guidance on site moves says a small to medium site can take a few weeks for most pages to move, larger sites longer, and that rankings may fluctuate temporarily. Recrawling any single page can take a few days to a few weeks, and asking repeatedly does not speed it up.

What makes a website redesign take longer
Delays rarely come from design or code. They come from decisions. The Project Management Institute's 2018 Pulse of the Profession found that 52% of projects experienced scope creep, and the most common causes of failed projects were changing priorities and objectives.

On website projects, those causes show up as:
- Content arriving late. The most common delay. Decide early who writes what, and set content deadlines before design starts.
- Too many approvers. Each extra reviewer adds a feedback round. Name one decision maker.
- Changing scope midway. New pages or features after design approval push everything back. Park them for phase two.
- Platform migration. Moving content, users and products between systems needs extra build and testing time.
- Integrations. CRM, ERP and booking connections depend on access and on other vendors.
How to plan backwards from a deadline
If you have a fixed date, such as a product launch or trade show, count backwards:
- Start with the launch date.
- Subtract the build time for your site type from the table above (6 weeks for a typical business site).
- Subtract an approvals buffer of one to two weeks.
- If URLs change, launch a few weeks before the date that matters, so search engines have settled when buyers arrive.
For a business site with a deadline in 12 weeks, that means starting now.
How to redesign your website faster
- Start with an audit, so decisions are based on data rather than debate.
- Gather content in parallel with design, not after it.
- Approve in stages: sitemap, then wireframes, then designs.
- Launch the core first and add secondary sections in a second phase.
- Agree the dates in writing, including your own review deadlines.
Still budgeting? See how much a website redesign costs. Collecting proposals? Our website redesign RFP guide helps you get comparable timelines from every agency.
People also ask about website redesign timelines
How long should a website redesign take?
Most business website redesigns take 4 to 8 weeks. Ecommerce, catalogue and platform-move projects usually take 8 to 16 weeks.
Can a website be redesigned in two weeks?
A visual refresh of a small site on the same platform can take 2 to 4 weeks. A full redesign with new structure, content and testing usually needs at least 4.
What is the longest part of a website redesign?
Usually content and approvals. Design and development follow a predictable schedule once content and decisions arrive on time.
Will my website go down during a redesign?
It should not. The new site is built and tested on staging, then switched over at launch, with redirects in place so visitors and search engines land on the right pages.
How long does it take to recover rankings after a redesign?
With proper redirects, Google says most pages of a small to medium site move within a few weeks, though rankings can fluctuate meanwhile. Larger sites take longer.
How long do redirects need to stay in place?
Google recommends keeping redirects for as long as possible, generally at least one year, so search engines and old links keep finding the new pages.
How long does Google take to index a redesigned site?
Recrawling can take from a few days to a few weeks. Submitting an updated sitemap helps Google discover changes, but repeated requests do not speed it up.
How often should a website be redesigned?
There is no fixed cycle. Redesign when the data says so: falling enquiries, an unsupported or slow platform, a rebrand, or a business that has outgrown its structure.
Can you redesign a website in phases?
Yes. Launching the core templates and key pages first, then adding sections in a second phase, shortens the critical path and gets results sooner.